Richmond Road Stage 2

Project Name
Richmond Road Stage 2
Client
Roads Maritime Services
$Value of project
$50 million
Location of project
Marsden Park
Contract period
April 2014 - March 2016
Scope of works
  • Upgrading Richmond Road from a two lane undivided road to a four lane divided road between Townson Road and Garfield Road West
  • Providing a central median to separate opposing traffic, accommodate landscaping and median drainage and allow for future widening to six lane carriageway into the median
  • Providing a central median to separate opposing traffic, accommodate landscaping and median drainage and allow for future widening to size lane carriageway into the median
  • Providing four signalised intersections along Richmond Road: at Quarry Road, South Street, Pius Lane/Vine Street, and Garfield Road West plus a signalised intersection at Garfield Road West/ School Access Road
  • Providing an unsignalised intersection at Grange Avenue with left in/ left out vehicular movement
  • Providing a 3.0m wide concrete path for the shared used of pedestrians and cyclists along the western side of the road
Project Highlights
  • 2 & 6 cell culvet construction 
  • Garfield Road West signalised intersection
  • Traffic switches
  • Services construction - NBN, Telstra and Optus Fibre optic as well as Gas, watermain, electrical reticulation including 132KV