Project Name:

 Princes Highway Upgrade – AOKP 

Client:

Transport for NSW (TfNSW)

$ Value of Project:

 

Location of Project:

Kirrawee, NSW

Duration:

 April 2021 – December 2021 

Description of Project:

 The project included the construction upgrades to Acacia Road and Old Princes Highway Intersection, Oak Road Intersection, Kingsway and President Avenue. 

Scope of Works:

The key features of the works included:

  • Construction of additional right turn lanes
  • Relocation of 200mm and 750mm water mains
  • Installation of isolation valves to existing 750mm water mains
  • Relocation of utilities
  • Earthworks including clearing and grubbing
  • Removal and stockpiling of topsoil
  • Excavation and cutting
  • Placement of general fill