Bells Line of Road – Overtaking Lane 1

Bells Line of Road – Overtaking Lane 1

lrg_58560_P1090932
lrg_99473_P1090860
lrg_25892_P1090866
lrg_72801_P1090913
lrg_58560_P1090932 lrg_99473_P1090860 lrg_25892_P1090866 lrg_72801_P1090913

Project Name:

Bells Line of Road – Overtaking Lane 1

Client:

Downermouchel

$ Value of Project:

$3 million

Location of Project:

Kurrajong Heights, NSW

Duration:

December 2014 – July 2015

Description of Project:

The project involved the widening of both sides of the existing pavement to introduce a westbound overtaking lane. The project was necessary to relocate high voltage power lines and enhance the drainage and safety of the road pavement. The construction included, property adjustments and significant traffic staging. 

    Scope of Works:

    The key features of the works included:

    • Reconstruction and widening of BLOR at Kurrajong Heights from 1km to the West of Val Wheeler Drive to 1.3km to the east of Pittmans Road
    • Earthworks
    • Stormwater drainage
    • Subsurface drainage
    • Pavement construction
    • Property adjustments
    • Ancillary works
    • Safety barriers
    • Guide posts
    • Pavement marking
    • Sign posting
    • Fencing