Bells Line of Road – Overtaking Lane 1
Bells Line of Road – Overtaking Lane 1
Project Name:
Bells Line of Road – Overtaking Lane 1
Client:
Downermouchel
$ Value of Project:
$3 million
Location of Project:
Kurrajong Heights, NSW
Duration:
December 2014 – July 2015
Description of Project:
The project involved the widening of both sides of the existing pavement to introduce a westbound overtaking lane. The project was necessary to relocate high voltage power lines and enhance the drainage and safety of the road pavement. The construction included, property adjustments and significant traffic staging.
Scope of Works:
The key features of the works included:
- Reconstruction and widening of BLOR at Kurrajong Heights from 1km to the West of Val Wheeler Drive to 1.3km to the east of Pittmans Road
- Earthworks
- Stormwater drainage
- Subsurface drainage
- Pavement construction
- Property adjustments
- Ancillary works
- Safety barriers
- Guide posts
- Pavement marking
- Sign posting
- Fencing