Campbelltown Road Upgrade 

Campbelltown Road Upgrade

Image 12 Campbelltown Road 1 (1)
Image 13 - Campbelltown Road (1)
Image 14 - Campbelltown Road (1)
Burton20210722-286 ben-williams.com (1)
Burton20210722-141 ben-williams resized
Image 12 Campbelltown Road 1 (1) Image 13 - Campbelltown Road (1) Image 14 - Campbelltown Road (1) Burton20210722-286 ben-williams.com (1) Burton20210722-141 ben-williams resized

Project Name:

Campbelltown Road Upgrade 

Client:

Transport for NSW (TfNSW)

$ Value of Project:

$37.6 million

Location of Project:

Bardia, NSW

Duration:

May 2018 – July 2020

Description of Project:

The works involved the construction of roadworks and associated activities for the upgrading of the section of Campbelltown Road to dual carriageways over a length of approximately 1.2km from east of East Town Centre Road to west of New Macdonald Road, Bardia.

    Scope of Works:

    Key features of the works included:

    • Construction of new signalised intersections at East Town Centre Road, Soldiers Parade and New Macdonald Road (at a new location from the existing intersection)
    • Roadworks including erosion and sedimentation, clearing and grubbing, earthworks (including the provision of a controlled subgrade layer), stormwater and subsurface drainage and pavement construction
    • Construction of a blockwork retaining wall approximately 90m long and 1m high along the Conservation Area boundary north of East Town Centre Road
    • Major utility relocations including recycled and potable water mains, gas mains, street lighting and electrical infrastructure, telecommunications and the construction of ITS infrastructure
    • Miscellaneous works including property adjustments, fencing, construction of kerbs and gutters, wire rope safety barriers, concrete paving for shared path, signposting, pavement markings and landscaping