Project Name:

Denmark Link Road 

Client:

Transport for NSW 

$ Value of Project:

15 million

Location of Project:

Riverstone, NSW 

Duration:

January 2023 – Current 

Description of Project:

To deliver the NWGC Road Network Strategy, TfNSW is working with Blacktown City Council to develop local plans to improve traffic flow, within the Riverstone Town Centre and to the Westminster Street bridge. A new local link road connection is being built between Garfield Road West and the Westminster Street bridge at Schofields. The link road will alleviate traffic congestion along Garfield Road West around the railway level crossing at Riverstone. This road will provide an alternative local connection for light vehicles to cross the Richmond railway line and avoid the need to enter Riverstone Town Centre.

Denmark Link Road will provide a connection from Garfield Road West at Riverstone via Denmark Road intersection to West Parade. West Parade will be extended to the Westminster Street Bridge at Schofields.

Scope of Works:

The key features of the works included:

  • Utilities installation, relocations and protection works;
  • Removal and disposal of existing footpaths, stormwater drainage, and other minor structures
  • Earthworks including clearing and grubbing, removal, and disposal off-site of topsoil, excavation of cuttings, placing of general fill, removal and treatment of unsuitable material, offsite disposal of spoil material as required and construction of Selected Material Zone
  • Modification to existing and construction of new stormwater drainage (both surface and subsurface)
  • Construction of new reinforced concrete box culverts
  • Construction of new pavements including unbound base and subbase layers and asphaltic concrete wearing, intermediate and corrective courses
  • Mill and re sheet of existing pavements
  • Construction of safety barriers
  • Pavement marking and raised pavement markers
  • Property Adjustments
  • Ancillary Works, including new kerbs and gutters, paving of shared paths and infill medians
  • Road furniture and street lighting
  • Signposting
  • Landscape and Vegetation works