Project Name:

Peppertree Quarry 

Client:

 Boral

$ Value of Project:

 $11.5 million

Location of Project:

 Marulan, NSW

Duration:

 November 2017 – June 2018

Description of Project:

The clearing and grubbing of the borrow area, railway embankment and dam water storage areas. Excavation of the borrow area to a depth of approximately 20 metres. The basic requirement was to excavate to ‘clean’ rock (between 6 to 30 metres in depth). Construction of a dam using suitable material from the borrow area (including; associated riprap), rail embankment, quarry dewatering, noise bunds, stripping and stockpiling of topsoil for re-use in re-vegetation of bunds and embankments, stockpiling of oversize rocks, specalised landscaping, haul roads (incl. protective bunds for use during construction and for future operations).

Scope of Works:

The key features of the works included:

  • Construction of haul road/s including ramps 
  • Maintenance of a haul road from the existing pit to the Overburden Storage Areas. 
  • Clearing and grubbing Railway embankment and dam water storage areas
  • Excavation of the borrow area to a depth of approx 20m 
  • Excavation of clean rock between 6 to 30m in depth
  • Quarry dewatering 
  • Stripping and stockpiling of oversize rocks to be used as riprap and drainage works 
  • Specialised landscaping